Download Online Help Print

Previous Topic

Next Topic

Book Contents

Book Index

Override Button, via Engineering Control (Shop) P/N

Select the Override but_override_small button to apply specific P/N S/N Effectivity if required.

 

Select Checkbox - Click to make the E/C not Effective against the currently selected P/N S/N.

At default all P/N S/Ns will be selected. If many P/N S/Ns are listed here, select the Select All button, and then just remove the S/Ns that you do not require by deselecting (un-checking) as necessary.

To view details regarding the currently selected P/N S/N, select the P/N and S/N button.

To include additional information, select the Notes but_notes_small and/or Attachment but_document_ctl_sm buttons. To view past information relating to the record, select the Audit but_audit_sm button.

In This Section

Notes Button, via Engineering (Shop) Effectivity Override

Attachment Button, via Engineering (Shop) Effectivity Override

P/N and S/N Button, via Engineering (Shop) Effectivity Override

Audit Button, via Engineering (Shop) Effectivity Override

See Also

Engineering Control (Shop) P/N Buttons

Notes Button, via Engineering Control (Shop) P/N

Attachment Button, via Engineering Control (Shop) P/N

Audit Button, via Engineering Control (Shop) P/N

Top of Page Download Online Help Print