Download Online Help
Print
|
||||||
Load Fixed Asset Checkbox, via P/N Initial LoadNotice the Load Fixed Asset
If this button is not selected when Initial Loading a part into inventory, the Fixed Asset will be created with a Value of 0.00; users would then have to go and manually enter a Value amount to the Fixed Asset at a later time. If not selected, an informational prompt appears after the window is saved.
Note: If the Unit Cost is null (not entered), Journal Entries will not be created for those P/N Categories which have Actual P/N Costing Methods. Journal Entries will be created for those P/N Categories which have Average P/N Costing Methods. |
||||||
| Top of Page |
Download Online Help
Print
|
|||||