Publication Date: 8/17/2026
Share
Print
|
||||||
GSE Engineering Control, Other TabThe GSE Engineering Control, Other Tab allows the user to enter additional, optional, information for an GSE E/C.
The following information/options are available in this window: E/C Superseded By The E/C entered in this field supersedes the original E/C selected into. This feature is used to phase in one E/C and phase out and terminate the current E/C selected. The E/C that is being superseded will be identified as such (flagged in red text) on the E/C General Tab. E/C Superseded Date The date that the superseding E/C takes effect. Internal Capability checkbox When selected, this flag will appear in the Planning Query to allow planners to know that the work can be carried out internally as opposed to having a third party maintenance organization carry it out. Mod NO Modification Numbers for E/Cs. This field is informational only. Effectivity NO This does not relate to A/C or E/C Effectivity. This field is informational only. Ground Time Require The amount of time needed for an aircraft to be on the ground in order to comply with the E/C. The time format is user defined by hours (0.00). This information appears on the A/C Planning Query results window as GTR (Ground Time Required). Capability Area The capability area identifies where a maintenance task can be accomplished in association with the customer's internal capabilities (e.g., a particular E/C can only be accomplished during a heavy maintenance visit at a heavy maintenance capable Site). The capability area can be assigned for E/Cs, P/N Controls, and Defect Reports. However, a maintenance task with any Capability Area can be scheduled on Work Orders at Sites that have their Capability Area set to 'ALL'. The Capability Area can also be used as a filter in planning when scheduling maintenance events. For more information regarding the Capability Area, refer to the Capability Area section of the Planning Transaction Code Manual. Maintenance Program The part's associated Maintenance Program. Repair / Alteration Defines if the record requires Repair or Alteration. Other - The component is neither altered or repaired. This is a miscellaneous option. Alteration - This compliance of the E/C will alter the component (i.e. the removal or addition of sub-components). Repair - The compliance of the E/C will repair the component (i.e. a structural component has sheet metal work completed to strengthen the integrity of the structure). Repair/Alteration Classification The level of Repair/Alteration (Major, Minor) required for this E/C. _____________________________________________________________________________________ |
||||||
| Top of Page |
Publication Date: 8/17/2026
Share
Print
|
|||||