Download Online Help Print

Previous Topic

Next Topic

Book Contents

Book Index

Engineering Control Shop, Schedule Controlled By Tab

For regular Engineering Controls, the Schedule tab allows users to create or edit the E/C's schedule details. But from the E/C Shop window, the Schedule tab is available to edit certain features of the Shop E/C.

The only changes that can be made to the Shop E/C schedule is the Next E/C functionality, the Effective Date, and the Repeat Number (see below). The First and Repeat Schedules are not meant to be utilized by Shop E/Cs; these fields are only meant for regular E/Cs.

eMRO_EngineeringControlShop_ScheduleControlledByTab(1)

 

The following options/information is available in this window:
_________________________________________________________________________

Effective Date

Entered as the date from which the user requires to track time on the E/C being set up unless a Total Schedule has been defined. Once the effective date is entered and the A/C or P/N Effectivity for the E/C is applied, changing the effective date on this Tab will not change the effective dates on each individual aircraft or component that the E/C is effective to. Either the Effectivity will need to be removed and re-applied, or the effective date field will need to be changed individually in the Effectivity Override window for each tail number or component.

Note: If the effective date is greater than the current date, planning will not forecast for this E/C until the effective date has been met.

Reset Date for all Effective Items but_reset_sm button

Select the Reset Date button to reset the effective dates for items not previously complied with and/or not overridden. The following window will appear upon resetting the effective dates:

Repeat Number

The number of occasions the E/C will be repeated. If the Repeat Number is set to 1, the E/C is a one time only E/C and only the First Schedule is applicable. If the Repeat Number is set to 9999, the E/C will be carried out on the First Schedule 1 time and then the Repeat Schedule indefinitely.

If the Repeat Number is a specific number, such as 5, the E/C will be carried out on the First Schedule 1 time and then be repeated 4 times according to the parameters configured on the Repeat Schedule (and then terminated).

Note: If the Repeat Number is set to 1, the Redo checkbox appears:

Next E/C

This field is used to form a dependence between a phase group of E/Cs used to set up checks that will automatically follow each other. For example, if the user has four phases for the K-Check; phases K1 through K4 and each has it's own requirements. They may be set up individually and linked in chronological order using this field. The system can move from K1 to K2 automatically following completion of K1. A user may verify the Next E/C order by selecting on the Next E/C but_select_next_ec_query_small button to the right of the field.
Once E/C K1 is complied with, the E/C K1 completion date will become the effective date for E/C K2 (the system will automatically populate the Effective Date for the aircraft tail number). The most recently complied E/Cs effective date (K1) will return to 00/00/0000 upon it's compliance. With the example of checks, the user must also remember to keep the repeat number at 9999, so the cycle will continue. To set up this functionality, the Effective Date must be set to 00/00/0000. The current E/C to be carried out will have its effective date set, which then returns to 00/00/0000 upon compliance.

Note: The Schedule Control Tab is a preferred method of creating E/C relationships and dependencies.

Note: It is important to select the the current phase of the Next E/C when deferring a defect. For additional information, refer to How to Query for the Current Phase of the Next E/C via Troubleshooting Tips of the Engineering - E/C Training Manual.

_________________________________________________________________________

See Also

Engineering Control Shop

Engineering Control Shop, General Tab

Engineering Shop, Schedule Tab

Engineering Control Shop, Schedule Control Tab

Engineering Control Shop, Other Tab

Engineering Control Shop, E/C Content Tab

Engineering Control Shop, Optional Tab

Engineering Control Shop, Warranty Tab

Engineering Control Shop, Affected Manuals Tab

Engineering Control Shop, Authorization History Tab

Engineering Control Shop, Location/Site Ban Control Tab

Engineering Control Shop, Restrictions Tab

Engineering Control Shop, Informational Tab

Engineering Control Shop, Revision History Tab

Engineering Control Shop, Vendor Restriction Tab

Engineering Control Shop Buttons

Top of Page Download Online Help Print