Publication Date: 8/17/2026
Share
Print
|
||||||
|
After selecting the P/N CTL
The following information/options are available in this window: E/C The Engineering Control that specifies aircraft or component scheduled maintenance intervals. P/N The Part Number reference for the aircraft part. This is the Part Number associated to the E/C. Load at Receiving checkbox This checkbox is strictly for the Purchase Order, Loan Order, and Engineering Control receiving and the P/N Initial Load feature. Repair Order for already existing Goods Received Batch Numbers (GRN) where the P/N was changed will apply the effectivity, but the E/C can be deselected as required. Override checkbox Select this checkbox if this Part Number has been overridden in the past via the Override Do Not Allow Reset R/O checkbox Select this checkbox to indicate that this record should not be reset (i.e. not selected for compliance) when associated with a Repair Order. When this Part Number is on a Repair Order, the default setting for this is that there will be no checkbox available in the control window to be selected or de-selected, it is not visible. Auto Reset On R/O checkbox Select this checkbox to indicate that this E/C should be reset (selected for compliance) when this E/C is associated with a Repair Order. This will be the default setting when this Part Number is on a Repair Order. This option can be overridden at the Repair Order level and de-selected. All P/N E/Cs of Mandatory Classification will receive automatic E/C Compliance upon receipt of Vendor Repair Order. Auto R/O Print checkbox If this checkbox is selected, the E/C will automatically be printed on Repair Orders that are issued for the part indicated. This will be the default setting when this Part Number is on a Repair Order. This option can be overridden at the Repair Order level and deselected. Do Not Allow Reset Production checkbox Select this checkbox to indicate that this E/C should not be reset (i.e. not selected for compliance) when this E/C is associated with a Production Work Order. P/N Modify To When a P/N is entered in this field, (when an existing P/N has this E/C associated and the E/C is complied with, upon receiving the P/N), the P/N will convert to the P/N Modified To Number. When populated, the Modify To in Production/Shop Checkbox appears. This is a user defined option.
Applicable radio button Select if this P/N is applicable to this particular E/C. Not Applicable radio button Select if this P/N is not applicable to this particular E/C. Issue To radio button Select if the E/C has been issued to this P/N. (The E/C does not need to be put into effect). If selected, select the P/N S/N that the user would like to add compliance for. Range Select this button to access the Engineering Control Range window. This option allows the user to apply effectivity to a serial number range with applicable status and reason information for in range and out of range serial numbers. _____________________________________________________________________________________ |
||||||
| Top of Page |
Publication Date: 8/17/2026
Share
Print
|
|||||