Publication Date: 8/17/2026
Share
Print
|
|||||||
|
The results of the Part Forecast View are displayed, as follows:
The following information/options are available in this window: Available Inventory The Part Number reference for the aircraft part. Requirement The Detail of the pre-load requirement. Open Order / REQ / etc. If there are open Orders or Requisitions for the part (and the applicable quantity). The system will show any open Requisitions and Orders for the P/N and the date expected delivery date. If the requirement is overdue, the date will be in RED. The quantity will be shown along with a sub-total of the quantity of parts that are/would be available if the Reqs/Orders arrived. A/C The Aircraft requiring the pre-load item. EC/Defect/Control The Engineering Control/Defect/Part Control relating to the pre-load item. Task Card The Task Card / Job Card that details the scheduled maintenance work. Plan Date If an Open Order or Requisition is linked to the line item, then the Plan Date is the Order's Delivery Date or the Requisition's Required Date. If there is no open Order or Requisition, then the Plan Date is the current date. Date The Due date of the E/C, Defect, Control, Order or Requisition. Qty The Quantity of the Requirement, Order, or Requisition. The quantity shows negative when more are required than are available, requisitioned or on order. Balance The remaining Stock Balance after taking everything into consideration. RED arrow will show items that require attention. PN Category The category of the part as defined in Settings/ Explorer/ System Transaction Code Explorer/ Settings/ P/N Category (e.g. Rotable, Consumable, Repairable) and entered for the particular part in the P/N Master. Reserve checkbox Indicates whether or not a part is reserved. The Reserve status is set in the Task Card P/N window. Order By Order By is the Due Date + Average Lead Days. Due Date The Due Date of the planning element. However, if the Due Date is less than the current date (overdue), then this field defaults to the current date. This field will appear red if the maintenance event is overdue. _____________________________________________________________________________________ This window can also be accessed through selecting the P/N The The Within these results, additional information of each part can be viewed through the P/N
|
|||||||
| Top of Page |
Publication Date: 8/17/2026
Share
Print
|
||||||