Publication Date: 8/17/2026
Share
Print
|
|||||||
Loan Order Return and FinalizationDuring use of the P/N, the user may need/decide to keep the P/N and Convert the Loan Order to a Different Order Type. After utilizing the P/N, which is typically completed through installation on the A/C and later removing the P/N from the A/C, the user is ready for the Loan Order Return. Upon returning the P/N, the user indicates the completion of the Loan Order process through Loan Order Finalization. The following is the basic process flow for the Loan Order Return and Finalization:
|
|||||||
| Top of Page |
Publication Date: 8/17/2026
Share
Print
|
||||||