Publication Date: 11/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Receiving Inspection Detail, R/I Requirement List Tab

The R/I Requirement List Tab displays notes that have been set up for the part via the Settings/ Update/ P/N/ Technical Engineering Tab/ R/I Notes button. If the part being received is an NHA or NLA, the associated components will appear listed on the R/I Requirement List Tab. All components in the assembly will appear on the tab, regardless of which component in the assembly is being received. If there is a note added, the R/I Requirement List tab will appear first when selected.

eMRO Receiving Inspection Detail, RI Requirement List Tab

emrov8 Note: When a P/N has Receiving Inspection Notes that are added via the P/N Master, the R/I Requirement List tab is highlighted in red, and is opened by default when a Receiving Inspection Detail is opened. For more information, refer to the Technical Engineering tab, via the P/N Master in the Settings Training Manual.

 rired

 

The following information/options are available in this window:
_____________________________________________________________________________________

P/N

The Part Number reference for the aircraft part.

Requirement

Relevant P/N receiving inspection information.

_____________________________________________________________________________________

See Also

Receiving Inspection Detail

Receiving Inspection Detail, General Tab

Receiving Inspection Detail, Informational Tab

Receiving Inspection Detail, Transaction History Tab

Receiving Inspection Detail, Warranty Information Tab

Receiving Inspection Detail, Additional Work Required Tab

Receiving Inspection Detail Buttons

Part Number Identification Tag, via Receiving Inspection

Top of Page Publication Date: 11/17/2026 Share Print