Publication Date: 11/17/2026
Share
Print
|
||||||
|
The Transfer E/C From the W/O Engineering Control window, select one or more E/Cs to be transferred by selecting the E/C Transfer checkbox to the right of each E/C to be transfered. Then select the Transfer E/C
The following drop down menu appears. Select a different Work Order that this E/C will be transfered to. Only those Work Orders that the specific E/C can be transferred to will appear in the drop down selection window. The selected E/Cs are then removed from this W/O.
The following window pops up to confirm the transfer. Select Yes then Submit.
Notice that the selected E/Cs have been transferred to the selected Work Order.
|
||||||
| Top of Page |
Publication Date: 11/17/2026
Share
Print
|
|||||