Publication Date: 11/17/2026
Share
Print
|
||||||
Follow Up Requirements (FUR) ProcessThe Follow Up Requirements (FUR) option allows users to create Engineering Controls with adjustable maintenance schedules that allow tracking via Planning. These FUR E/Cs are meant to address further necessities required after the creation of a Defect Report. The Follow Up Requirements Process is designed to allow users to visualize the entire procedure for creating a FUR E/C.
|
||||||
| Top of Page |
Publication Date: 11/17/2026
Share
Print
|
|||||