Download Online Help
Print
|
||||||
|
The Lower Level and Override (Ovr) checkboxes are available with the Called On and Called On At options. The user may only select one of the two checkboxes. They are described as follows:
The following options/information is available in this window: Lower Level checkbox When this checkbox is selected, the system assumes that all lower level Task Card steps associated to a Child E/C are contained in the Parent E/Cs Task Cards. This feature is helpful when a Parent E/C includes tasks that are identical to tasks on the original or Child E/C. An engineering decision must be made to verify if the Parent E/Cs Task Cards contain the same steps of the Child E/C. No Task cards from the Child E/C will be added to the Work Order AT ALL.
Note: When Switch Ovr checkbox (Override checkbox) If selected, the system will verify if there is at least one compliance record that has been written for the original E/C related to the A/C (tail number) on the Work Order. If at least one compliance record exists, the system will not bring in the Task Cards of the original E/C. If a compliance record does not exist, the system will bring in the Task Cards (of the original E/C) for one time only and from that point forward, will not. Note: When Switch
_________________________________________________________________________ |
||||||
| Top of Page |
Download Online Help
Print
|
|||||