Called On Repeat, via Engineering Control, Schedule Control and Schedule Controlled By Tabs

The Called On Repeat option is to be used with the Called On First option.

Note: The Child/ Dependent E/Cs interval should always match the interval of the Parent E/Cs schedule. For example, if the Parent E/C is scheduled by 500 hours or 185 days, then the Child/ Dependent E/Cs schedule should match. Additionally, we recommend that the Plan E/C checkbox, via the Engineering Control, Schedule tab remains selected for the Child/ Dependent E/C to allow for Planning to observe the E/C.

A Called On First E/C must be specified prior to choosing this option or an error message will appear.

The Called On Repeat option must be selected to have the original E/C initiate on another Parent E/C after the Called On First E/C compliance. The original E/C will then be performed in accordance with the Called On Repeat parameters.

 

The following options/information is available in this window:
_________________________________________________________________________

Freq (Frequency)

If the original E/C is to be performed on an interval basis, use the Frequency Field. For example, if the Frequency is set to 02, then every 2nd time that the Parent E/C is attached to a Work Order, the Called On, or Child E/C, is also automatically brought onto the Work Order as well.

Start At

The number specified in the Start At field will instruct the system to initiate the original E/C on the Control E/C's occurrence. Please note that this is not a Frequency number.

_________________________________________________________________________

 

In this example, the original E/C will start at the 3rd occurrence (Start At field) of the Called On Repeat E/C (after the completion of the Called On Repeat E/Cs 2nd frequency, which has 7 total frequencies). Since the Start At number represents an occurrence, not a Frequency number, the Start At number can be greater than the Total Frequency number of the Called On Repeat E/C.

The Frequency field must be used if the original E/C is to be performed on an interval basis. When the Called On Repeat E/C is attached to the Work Order, the original E/C is also attached to the Work Order, providing that the Original E/C has been complied with in accordance with the Called On First parameters at least once.

See Also

Engineering Control, Schedule Controlled By Tab

Called On, via Engineering Control Schedule Control and Schedule Controlled By Tabs

Called On 1st, via Engineering Control, Schedule Control and Schedule Controlled By Tabs

Called On At, via Engineering Control, Schedule Control and Schedule Controlled By Tabs

E/C To Be Activated, via Engineering Control, Schedule and Schedule Controlled By Tabs

E/C To Be Terminated, via Engineering Control, Schedule Control and Schedule Controlled By Tabs

Terminated E/C if Terminated, via Engineering Control, Schedule Control and Schedule Controlled By Tabs