E/C To Be Activated, via Engineering Control, Schedule and Schedule Controlled By Tabs

The E/C To Be Activated option allows the user to activate a specific E/C once the first compliance record is written for the Parent E/C.

Note: An A/C E/C cannot activate or terminate a P/N E/C.

The compliance record is written for the Parent E/C when the Work Order is closed. Once this occurs, the Child E/C is automatically activated.

The Effective Date of the E/C To Be Activated (Child E/C) must be set at '00/00/00' on the Schedule Tab. Once the parent E/C is complied with and the Work order is closed, that Work Order Actual Completion date will be the Effective Date for the E/C To Be Activated (Child E/C).

Only the A/C Tail Number specified in the original E/C compliance record will be affected by this E/C To Be Activated functionality.

Note: The user may utilize the E/C To Be Activated option with an unlimited number of E/Cs (provided the E/Cs have no effective dates and will be dependent on the E/C to activate it).

See Also

Engineering Control, Schedule Controlled By Tab

Called On, via Engineering Control Schedule Control and Schedule Controlled By Tabs

Called On 1st, via Engineering Control, Schedule Control and Schedule Controlled By Tabs

Called On At, via Engineering Control, Schedule Control and Schedule Controlled By Tabs

Called On Repeat, via Engineering Control, Schedule Control and Schedule Controlled By Tabs

E/C To Be Terminated, via Engineering Control, Schedule Control and Schedule Controlled By Tabs

Terminated E/C if Terminated, via Engineering Control, Schedule Control and Schedule Controlled By Tabs