Download Online Help
Print
|
|||||||
|
In this tab, part controls and engineering controls may be selected for reset and can be selected to be added to the Repair Order. The items displayed here must be set-up in the relevant sections of the system. When the items are returned from repair, these controls can be automatically reset and the part number changed (if applicable). The user can select the control to print on the Repair Order if required (for informational purposes). The fields that appear will depend on the specifications of the controls for the part. See the Settings Training Manual for additional information regarding the setup of Part Controls. The Part Control information will also appear on the Shop Work Order (R/O Information tab) for viewing. Due to the amount of fields in the Repair Order, Control tab window, for documentation purposes this window is displayed in two screen shots.
The following options/information is available in this window: Expand Select the Expand P/N Part Number associated to the Repair Order. Please note that any additional Part Numbers which may appear on this tab may be NLA to the NHA which appears on the Report Order Detail, General tab. ALL NLA component controls will appear under the appropriate P/N S/N. S/N Serial Number associated to the Repair Order. Please note that any additional Serial Numbers which may appear on this tab may be NLA to the NHA which appears on the Report Order Detail, General tab. ALL NLA component controls will appear under the appropriate P/N S/N. P/N Description The description of the part. RO Control checkbox Select the RO Control checkbox if you require this control to be reset by the Repair Order or if the part is received either at Order Receiving or Receiving Inspection (depending on the following switch):
Print checkbox Select to require the control detail to print on the Repair Order. Note: This may be pre-defined at both the P/N Control and P/N E/C windows. This may be overridden at the Repair Order level. ROS Classification Code The ROS Classification Code is used to specify the ROS message type that will be sent from the system to the Vendor. For additional information, refer to ROS Classification Code, via the Repair Order Detail, Control Tab of the Orders Training Manual. Control Any part controls applicable to this part/serial number will appear here. This could be from the Time Control effectivity (TSN, TSO, TSLSV etc.) or from the E/C file (for modifications, AD's etc.). P/N E/Cs are displayed in RED if they are mandatory. P/N Control P/N E/C Control Description The description of the Control. This description appear beneath the Control code. The P/N Control descriptions are defined in the code itself via Settings/ Explorer/ System Transaction Code. The P/N E/C descriptions are defined via the Engineering/ Update/ Engineering Control, General tab. Select All Selects all items by placing checks in the checkboxes to the left. Deselect All Deselects all items by removing all checks in the checkboxes to the left. Print Detail List Opens a P/N Detail Print page for the selected documents. From there users can print or e-mail the document. Schedule The Schedule is the time limit as defined by the control. For example, TSO may have a schedule of 1000 aircraft hours. This means that the part is to be overhauled within the scheduled parameters. Hours - P/N accumulated Aircraft hours scheduled for removal from aircraft, test on wing and/or Repair action. Cycles - P/N accumulated Aircraft cycles scheduled for removal from aircraft, test on wing and/or Repair Action. Days - P/N accumulated Aircraft Days or Calendar Days (dependant on the Calendar Control checkbox) scheduled for removal from aircraft, test on wing and/or Repair Action. Date - The exact date scheduled for removal from aircraft, test on wing and/or Repair Action. For additional information, please refer to the P/N Master, P/N Control Button Training Manual via Settings. Note: Parts with a schedule are referred to as Hard-time items while those without a schedule are referred to as On-Condition or Soft-time items. Actual The Actual is the accumulated component times for a particular part. For example, a component may have a total time of 1504 hours, 345 cycles and 180 days. The actuals minus the schedule will provided the time remaining on a unit for some scheduled action/ maintenance to occur. Hours - P/N Aircraft hours accumulated actuals. Cycles - P/N Aircraft cycles accumulated actuals. Days - P/N Aircraft Days or Calendar Days (dependant on the Calendar Control checkbox) accumulated actuals. For additional information please refer to the P/N Master, P/N Control Button section of the Settings Training Manual. Note: Although a part may not have a schedule, ALL installed serialized components do accumulate actual time. It is recommended that all serialized units contain a P/N Control for actual time monitoring (i.e. soft-time). Reset Date Date and time at which control information was reset for having been performed/complied. Note: If the P/N E/C does not have the P/N E/C Use E/C Effective Date checkbox selected, the reset date may be the A/C installed date, if the P/N E/C has Days controlled schedule. Calendar Control checkbox If a P/N Control is controlled by Calendar Day the checkbox must be selected and the scheduled Days increments regardless of A/C installation. If de-selected then the P/N Control will only accumulate while the part is installed on the Aircraft. P/N E/C Use E/C Effective Date checkbox If an P/N E/C is controlled by calendar days rather than installed days, then the P/N E/C Use E/C Effective Date checkbox will be selected. Whereas, the Reset Date is the last compliance date (effective date) for the P/N E/C and the day from which the P/N E/C will accumulate actuals. If de-selected and the P/N E/C has a Day controlled schedule, it will be only accumulated actuals based on A/C installed days. For additional information, please refer to the Engineering Control, Schedule Tab section of the Engineering - E/C Training Manual. Removal SCH / ACT Removal Schedule (SCH) is the number of removals which will have to occur prior to a maintenance Overhaul requirement for a given Part Number. This is commonly use for the A/C P/N Removal of tires. Removal Actuals (ACT) is the number of removals which have occurred for a given Part Number. With every removal, the P/N Removal Actual value increments. E/C Amendment The P/N E/C related amendment as defined on the Engineering Control, General Tab. Issued By The authority who issued the P/N E/C as defined on the Engineering Control, General Tab. Revision The revision related P/N E/C effective to the part number, authorized and attached to the Repair Order as defined on the Engineering Control, General Tab. Revision By The user who last revised or issued the revision for the P/N E/C as defined on the Engineering Control, General Tab. Revised Date The P/N E/C related amendment as defined on the Engineering Control, General Tab. _________________________________________________________________________
P/N Control / Shop E/C Link: The relationship between the P/N Control and Shop E/C are now linked. This is shown in the Repair Order, Control tab. The following P/N Control is linked to the below Shop E/C: The P/N is placed on the Repair Order: Go to the Repair Order, Control tab. When the Control checkbox for FNC is selected, the Control checkbox for 95278-A is selected. Similarly, if one checkbox is de-selected, the other becomes de-selected. The linked relationship between the P/N Control and Shop E/C can also be seen in Receiving Inspection Detail, R/O Control Tab, via Receiving Inspection which can be found in the Receiving Training manual. |
|||||||
| Top of Page |
Download Online Help
Print
|
||||||