The R/O Control tab displays the time control information for parts that have P/N controls and/or E/C's associated. The R/O Control tab is used to update P/N Control
Note: The switch
The following options/information is available in this window: Expand Select the Expand P/N The Part Number reference for the aircraft part. Please note that any additional Part Numbers which may appear on this tab may be NLA to the NHA which appears on the airOrder Detail, General tab. ALL NLA component controls will appear under the appropriate P/N S/N. S/N The Serial Number for the specific serialized part. Please note that any additional Part Numbers which may appear on this tab may be NLA to the NHA which appears on the airOrder Detail, General tab. ALL NLA component controls will appear under the appropriate P/N S/N. P/N Description The description of the part. Select checkbox Check to make the time control effective to that part number. Once selected, the option to edit the reset date of that particular time control and/or the removal actuals become available (if applicable). Control This is the Part Number with the time control. Schedule Hours The number of hours allotted for a specific time control schedule. The schedule figure is set up via the Settings/Update/P/N Control button. Schedule Cycles The number of cycles allotted for a specific time control schedule. The schedule figure is set up via the Settings/Update/P/N/P/N Control button. Schedule Days The number of days allotted for a specific time control schedule. The schedule figure is set up via the Settings/ Update/P/N/P/N Control button. Actual Hours The number of actual accumulated hours against the P/N Control schedule. Actual Cycles The number of actual accumulated cycles against the P/N Control schedule. Actual Days The number of actual accumulated days against the P/N Control schedule. Reset Date The last reset date of the P/N Control. Removal Schedule The removal schedule field is used to track component removals (i.e. a wheel assembly) where a certain number of removals should occur before an overhaul needs to be performed. Removal Actual The number of times the component has been removed from an aircraft. The removal actuals figure is automatically adjusted with each A/C P/N transaction. Calendar Control Select to activate calendar control on this part. Calendar selected items are “days by the calendar” regardless of whether installed on an aircraft or not. If calendar control is selected, the system will block the other time parameters for that entry by graying out the appropriate fields. Note: The switch Select checkbox Check to make the time control effective to that part number. Once selected, the option to edit the reset date of that particular time control and/or the removal actuals become available (if applicable). Control The Engineering Control that specifies aircraft or component scheduled maintenance intervals. Schedule Hours The number of hours allotted for a specific time control schedule. The schedule figure is set up via the Settings/Update/P/N Control button. Schedule Cycles The number of cycles allotted for a specific time control schedule. The schedule figure is set up via the Settings/Update/P/N/P/N Control button. Schedule Days The number of days allotted for a specific time control schedule. The schedule figure is set up via the Settings/ Update/P/N/P/N Control button. Actual Hours The number of actual accumulated hours against the P/N Control schedule. Actual Cycles The number of actual accumulated cycles against the P/N Control schedule. Actual Days The number of actual accumulated days against the P/N Control schedule. Reset Date The last reset date of the P/N Control. Removal Schedule The removal schedule field is used to track component removals (i.e. a wheel assembly) where a certain number of removals should occur before an overhaul needs to be performed. Removal Actual The number of times the component has been removed from an aircraft. The removal actuals figure is automatically adjusted with each A/C P/N transaction. _________________________________________________________________________
Additional Functionality: Note: If the Actuals are greater than the Schedule limit, but the proration Actuals are less than the Schedule limit, the system will use the Proration Actuals in RO Receiving. Note the Actuals in the P/N Inventory Control for the following P/N. The Prorated Part still displays time remaining even if the Actuals do not: The part is placed on an RO. Even if the time shows no remaining, it now considers the prorating Actuals and allows the part to be received: The system allows the part to be received as shown below: |
||||||
| Top of Page |
Download Online Help
Print
|
|||||