Download Online Help
Print
|
||||||
Engineering Authorization Management PrintThe Engineering Authorization Management Print window allows the user to search and create Engineering Management prints.
Note: These are customized prints. Print layouts and options may vary per operator.
The following options/information is available in this window: E/C The Engineering Control that specifies aircraft or component scheduled maintenance intervals. Control Type The Engineering Control Type (E/C or Task Card). Category The category of the E/C (i.e. AD, SB, CHECK). E/C Status The status of the E/C. When creating a new E/C the initial status will default to Pending; if the user requires to hold this E/C until ready it can be left as Pending, or alternatively it can be changed to another status. Repair/Alteration Define if the record requires Repair or Alteration. Inspection Program Reference This field allows users to set a reference for all MPD tasks during the import process. Document Any document information to be referenced for the part. Document Category The document category code for the document reference associated to the E/C. Sub-Category A Sub Category can be used to further define the E/C Category, if applicable. For example, you may want to classify your ADs for Engines, APUs, and Landing Gear separately. The Sub Category Transaction Code is set up via Settings/ Explorer/ System Transaction Code/ Engineering. A/C The individual Aircraft tail number. Repair/Alteration Classification The level of Repair/Alteration (Major, Minor) required for this E/C. E/C Type The Engineering Control Type. A/C Type The Type of Aircraft A/C Series The aircraft series the E/C is effective to. Print Compliance Text Select the Print Compliance Text radio button to print associated compliance data. Main Effective Date Enter the effective date range for the E/C. Entered as the date from which the user requires to track time on the E/C being set up unless a Total Schedule has been defined. Once the effective date is entered and the A/C or P/N Effectivity for the E/C is applied, changing the effective date on this Tab will not change the effective dates on each individual aircraft or component that the E/C is effective to. Either the Effectivity will need to be removed and re-applied, or the effective date field will need to be changed individually in the Effectivity Override window for each tail number or component. Reset Date The date that the E/C was complied with through the Work Order (Production or Shop) bgin Closed or the Repair Order being received. Component Status Status of the Component. Company The name of the airline company for which the E/C will be utilized. Control The Control (A/C, P/N, A/C Type, or ALL) used to auto generate the E/C reference. This field is used for naming purposes only. When the 'ALL' option is selected the E/C Control field will not auto generate the E/C reference. The E/C reference will auto generate from the Sub E/C field. Sub E/C Task Card Enter the associated Sub E/C Task Card. _________________________________________________________________________ |
||||||
| Top of Page |
Download Online Help
Print
|
|||||