Publication Date: 8/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

P/N Category Change Button, via P/N Master (General Inventory)

The P/N Category Change but_pn_category_change_small button allows for the change of any P/N’s category as required. The new P/N Category that is being assigned must have parts currently associated before a P/N Category Change can occur. When a P/N Change is attempted, the system will check for open; Loan, Exchange, Repair, and Transfer Orders before allowing the P/N category change. Positions and Time Controls against the current part must also be removed before changing the P/N Category.

Select the P/N Category Change but_pn_category_change_small button. Right click in the To Category field. The Drop Down Selection appears as shown below. Select a part type by double clicking on selection and click on the Find but_find_small button.

12_PNCategoryChange1

 

The following information/options are available in this window:
_____________________________________________________________________________________

From Category

The current category of the part.

To Category

The new category for the part.

S/N

The Serial Number for the specific serialized part.

_____________________________________________________________________________________

A list of P/Ns appear for the selected part type.

12_PNCategoryChange2

The user can manually enter a S/N, or click on the Auto Serial Number Assign but_auto_serial_number_assign_small button to have the system automatically create and assign serial numbers to all parts in the list.

For more information on the Auto Serial Number Assign but_auto_serial_number_assign_small button, please refer to the topic Auto Serial Number Assign Button.

Note: When a P/N is changed to serialized, a new Goods Received Batch number (GRB) is assigned to the part in inventory. As a result, the history of the of the part will be lost, but it could be referenced in the Inventory Transaction History Query window using the old GRB number.

Note: The P/N Category Change will only add a Journal Entry for the upgrade/downgrade from Rotable (Serialized) to Expendable (Consumable) and vice versa. There is not a J/E association from Expendable to Expendable, Rotable to Rotable, or Repairable to Repairable since they are of the same P/N Transaction Category. For more information, refer to the P/N Category System Transaction Code.

 

Warnings:

Users cannot change the P/N Category for tools that are checked out.

12_PNCategoryChange3

If the P/N order has been received but the order remains un-invoiced before attempting to change the P/N Category, the following error will appear:

12_Warning_PNOpenorUninvoicedOrdersExists

If a P/N Control already exists, the following error will appear:

PN_Control_Exists

If the P/N position already exists, the following error will appear:

12_PNCategoryChange6

If the P/N exists in the P/N Master, but is not present in Inventory, the following soft warning will appear:

12_PNCategoryChange5

In This Section

Auto Serial Number Assign Button, via P/N Category Change

See Also

P/N Master (General Inventory) Buttons

Notes Button, via P/N Master (General Inventory)

Interchangeable Button, via P/N Master (General Inventory)

Inventory Levels Button, via P/N Master (General Inventory)

P/N UOM Change Button, via P/N Master (General Inventory)

Bin Control Button, via P/N Master (General Inventory)

Image Button, via P/N Master (General Inventory)

P/N Change To Interchangeable Button, via P/N Master (General Inventory)

Cost Button, via P/N Master (General Inventory)

R/O Capability Button, via P/N Master (General Inventory)

Audit Button, via P/N Master (General Inventory)

Top of Page Publication Date: 8/17/2026 Share Print