Download Online Help
Print
|
||||||
|
The Engineering Control Activating Schedule is enabled by selecting the Activating Schedule checkbox in the Engineering Control, Schedule tab. Utilizing this option makes the Activating Total Hours, Cycles, and Days fields available, along with the Earliest checkbox, to specify when the First Schedule begins for the effective component(s) after the hours, cycles, and/or days are accumulated. This Schedule can be overridden through the Override Standard Schedule (E/C) Button, via The Engineering Control, Schedule Tab or the Override functionality of the P/N CTL Button, via Engineering Control. The following scenarios show the effect of the Activating Schedule on the Engineering Control in regard to its planning, as seen in the A/C Planning Query, particularly when applied to the Total Hours, Cycles and Days. Note: The Plan E/C checkbox must be selected for the E/C to appear in the A/C Planning Query.
Aircraft Total Hours: The following Engineering Control has been created. Notice the Hours of the First Schedule and the Total Hours specified in the Activating Schedule. Notice the E/C has effectivity to the following A/C. Only one of the effective A/Cs have accumulated Flight Hours more than that of the E/C's Activating Schedule. After running the A/C Planning Query for the E/C, notice only the A/C with more Flight Hours than the Activating Schedule appears. Additionally, in the Due List, the E/C is due at the combined Activating Hours and Scheduled Hours. In turn, the Actual Hours are the amount of Hours that exceed the Activating Hours (Current Flight Time - Activating Hours = Actual Hours). Note: With the Schedule Hours still set to that of the E/C's First Schedule, the Remaining Hours are the difference between the Schedule and Actual Hours, not the Current Flight Time, as is standard functionality.
Aircraft Total Cycles: The following Engineering Control has been created. Notice the Hours of the First Schedule and the Total Cycles specified in the Activating Schedule. Notice the E/C has effectivity to the following A/C. Only one of the effective A/Cs have accumulated Aircraft Cycles more than that of the E/C's Activating Schedule. After running the A/C Planning Query for the E/C, notice only the A/C with more Aircraft Cycles than the Activating Schedule appears. Additionally, in the Planning Results, the E/C is Due At the combined Activating Cycles and Scheduled Cycles. In turn, the Actual Cycles are the amount of the Cycles that exceed the Activating Cycles (Aircraft Cycles - Activating Cycles = Actual Cycles). Note: With the Schedule Cycles still set to that of the E/C's First Schedule, the Remaining Cycles are the difference between the Schedule and Actual Cycles, not the Aircraft Cycles, as is standard functionality.
Aircraft Total Days: The following Engineering Control has been created. Notice the Days of the First Schedule and the Total Days specified in the Activating Schedule. Notice the E/C has effectivity to the following A/C. For one specific A/C, notice the Service Date from which the Aircraft Days begin. After a particular amount of Days after the A/C Service Date, an A/C Planning Query is run. Notice that because the amount of Days that have passed is greater than the Activating Days, the A/C does appear in the Planning Results. Additionally, the E/C is Due At the combined Activating Days and Scheduled Days. In turn, the Actual Days are the amount of the Days that exceed the Activating Days (Aircraft Days - Activating Days = Actual Days). Note: With the Schedule Days still set to that of the E/C's First Schedule, the Remaining Days are the difference between the Schedule and Actual Days, not the Aircraft Days, as is standard functionality.
Part Number Activating Schedule: The functionality of the Activating Schedule is the same for P/N E/Cs as it is for A/C E/Cs. The following Engineering Control has been created. Notice the Hours of the First Schedule and the Total Hours specified in the Activating Schedule. The E/C is made effective to a particular P/N S/N. Notice the Hours that the P/N S/N has accumulated. After running the A/C Planning Query for the E/C, notice since the P/N S/N has accumulated more Hours than the amount specified on the Activating Schedule, it does appear in the Planning Results. Additionally, the E/C is Due At the combined Activating Hours and the Scheduled Hours. In turn, the Actual Hours are the amount of the Hours that exceed the Activating Hours (P/N Hours - Activating Hours = Actual Hours). Note: With the Schedule Hours still set to that of the E/C's First Schedule, the Remaining Hours are the difference between the Schedule and Actual Hours, not the P/N Hours, as is the standard functionality. |
||||||
| Top of Page |
Download Online Help
Print
|
|||||