Publication Date: 8/17/2026
Share
Print
|
||||||
|
The A/C Type Series A default P/N Control must be set up before prorated limit schedules can be applied; then, If a P/N S/N is installed on an N/H/A or A/C that is not set up with a prorated limit schedule, the P/N S/N will inherit the schedule set up in the default P/N Control. If the Prorating Limits checkbox is selected in the P/N Master, Technical Engineering tab, the prorating button will appear as the Prorated
Set up P/N Control Prorated Limit Schedule: Create a default P/N Control without an A/C, A/C Position, or NHA P/N.
Select the A/C Type/Series Enter the A/C Type/Series or N/H/A P/N that the prorated schedule is needed for and populate the prorated limit schedule. The P/N must be effective to the A/C Type/Series or exists as part of the N/H/A assembly.
The following information/options are available in this window: A/C Type/Series The Aircraft Type and Series/Fleet assignment. NHA P/N The part's Next Higher Assembly P/N (if applicable). If an N/H/A P/N is specified, the control will be applicable to the N/H/A P/N. All P/N Control schedules are action based. In other words, P/N schedules will not change seamlessly just because schedule criteria is met. There must be some transaction to generate the change in the P/N Control schedule. Examples of such actions are when a P/N is received, an A/C Position is changed, or when there is an A/C installation to trigger the schedule change against the part. Hours/Cycles/Days Prorated limit schedule for the A/C Type/Series or N/H/A P/N. Cascade to Inventory checkbox Select to apply the life limit schedule to all parts currently in service. Any parts currently installed on the A/C that exceed the new prorated limit schedule will be overdue. _____________________________________________________________________________________ Select the Save At the bottom of the the P/N Control window, the P/N Control has been duplicated for each A/C of the A/C Type/Series specified in the A/C Type/Series Import/Update pop up, and has inherited the prorated limit schedule. Each P/N Control can be edited as required on an A/C by A/C basis, modifying the schedule and entering the related Task Card or E/C.
|
||||||
| Top of Page |
Publication Date: 8/17/2026
Share
Print
|
|||||