Does the E/C have a Repeat Schedule?If the E/C has a Repeat Schedule, then the Repeat Number field must be populated, along with the Repeat Schedule Hours/Cycles/Days/Date, as applicable, for planning purposes. If the E/C is to be continuous, populate the Repeat Number field with 9999. If the E/C does not have a Repeat Schedule, then leave the Repeat Number and Repeat Schedule fields empty. For more information on these fields, refer to the Engineering Control, Schedule tab.
|
||||||