Publication Date: 8/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Transactional Process

The Transactional Process of the Assembly Management covers the ways in which assemblies are entered into the general inventory. Once the assembly components are within the Inventory system, whether installed or not, part times and movements can be tracked throughout their lifespans.

Assemblies can enter the Transactional Process via Orders, P/N Initial Loads (directly to Inventory), or A/C Initial Loads (directly installed). Once the assembly's NHA component is entered through either of these options, users are automatically prompted to enter all of the following NLA components of the Assembly.

The following is the basic life cycle of the Assembly Management, particularly its Transactional Process:

Assembly Management Swim Lane 3

Once the various Transactional Processes of the Assembly Management have been utilized, the Assembly Installation/Removal can be conducted.

In This Section

Is Receiving Inspection required?

Was the Assembly N/L/A built during Receiving?

Transactional Process Complete

See Also

Assembly Management Process Topics

Assembly Setup and Configuration

Creating Assembly

Assembly Installation/Removal

Top of Page Publication Date: 8/17/2026 Share Print