Publication Date: 8/17/2026
Share
Print
|
|||||||
Kit Creation and BuildAfter the Principle Part of the Kit has been created in the P/N Master, the Kit as a whole, particularly which parts will be included, must be created in the system through the Kit The following is the basic life cycle of the Kit Management, particularly the Creation and Build:
Upon the Kit being created in the system through the P/N Master and built or brought into Inventory, the Kit can be utilized. If necessary, a Kit Break and Re-Build can later be conducted. |
|||||||
| Top of Page |
Publication Date: 8/17/2026
Share
Print
|
||||||