Publication Date: 8/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

11.5 - Production Buttons

Engineering Control Button, via the Work Order Header Buttons

When Production Switch ADDECNOT is set to No, even if a Task Card linked to the E/C has Aircraft effectivity to the Work Order's Aircraft but the 'Applicable A/C' field (via the Task Card Control button of the E/C window) is not the same as the W/O's Aircraft, then the Task Card will not be added to the Work Order when the E/C is linked. The E/C Task Card's 'Applicable A/C' field will override the Task Card's aircraft effectivity when the Task Card is linked to a Work Order through this E/C linkage. For more information refer to the Task Card Control Button, via Engineering Control in the Engineering - E/C Training Manual.

ISE Communications Button, via W/O Non-Routine Task Card

The ISE Communications but_ise_communications_small button allows the user to distinguish specific information that is to be associated to a Work Order Non-Routine Task Card, along with the individual Employee responsible for this information and any supporting documents that may be relevant. Multiple records of information can be associated to the N/R T/C with varying necessary Priority of it being required.

P/N Button, via the Items Multi Button

Robbed Part checkbox: Select this checkbox to indicate that the required part was removed from an aircraft in order to fulfill the part requirement.

W/O Template Button, via the Work Order Header Buttons

From the Work Order header window, users can link a W/O's Task Card Phases to a W/O Template by selecting the W/O Template but_wo template button.

See Also

11.5 - Production

11.5 - Production Module

11.5 - Production Switches

11.5 - Production Transaction Codes

Top of Page Publication Date: 8/17/2026 Share Print