Publication Date: 11/17/2026
Share
Print
|
||||||
|
The Keywords tab is used to assign keywords to Task Cards to help users find the Task Card more easily; e.g. when a planner is searching for a Task Card in the Production Control application. Any keywords that existed on the Task Card before it was attached to the W/O, via Engineering/ Update/ Engineering Control Selection, Task Card, Keywords tab, will also appear in the W/O Task Card, Keywords tab. User can add keywords by selecting the New Note: Each keyword must be set up as a transaction code, via System Transaction Code Explorer/ Engineering/ Task Card KeyWords.
|
||||||
| Top of Page |
Publication Date: 11/17/2026
Share
Print
|
|||||