|
MANUALS > Engineering > Engineering Module - E/C > Engineering E/C, Update Menu > Engineering Control Selection > Engineering Control > Engineering Control, P/N Effectivity Control Tab
Engineering Control, P/N Effectivity Control Tab
The P/N Effectivity Control Tab allows the user to apply or remove A/C Effectivity as setup in the currently selected E/C to a specified P/N. The P/N is made effective to the A/C or effectivity is removed from the A/C once the compliance record for the E/C is written. The compliance record is written for this E/C once the Work Order is closed.
Note: The functionality found in this tab is intended for Aircraft Engineering Controls.

Note: The user has the option to enter as many Part Numbers as desired by clicking on the New button. Additionally, the user also has the option to remove P/Ns by utilizing the Delete button.
A/C effectivity can be applied to a P/N via E/C Compliance even if there is an Interchangeable relationship set up.
|
See Also Engineering Control Engineering Control, General Tab Engineering Control, Schedule Tab Engineering Control, Schedule Control Tab Engineering Control, Other Tab Engineering Control, E/C Content Tab Engineering Control, Optional Tab Engineering Control, Warranty Tab Engineering Control, Affected Manuals Tab Engineering Control, Schedule Controlled By Tab Engineering Control, Authorization History Tab Engineering Control, Location/Site Ban Control Tab Engineering Control, Restrictions Tab Engineering Control, Informational Tab Engineering Control, Revision History Tab Engineering Control, Vendor Restrictions Tab Engineering Control Buttons |
|