Download Online Help
Print
|
||||||
|
The R/O Control tab will appear when receiving Repair Orders via the Receiving Inspection option, and not the Order Receiving option. The R/O Control tab allows the user to define what P/N Controls and P/N E/Cs have been complied with against the Repair Order. Over due items must be complied with/reset in order to be received in a serviceable location.
Note: The switch
The following options/information is available in this window: Expand Select the Expand P/N The Part Number reference for the aircraft part. Please note that any additional Part Numbers which may appear on this tab may be NLA to the NHA which appears on the Report Order Detail, General tab. ALL NLA component controls will appear under the appropriate P/N S/N. S/N The Serial Number for the specific serialized part. Please note that any additional Serial Numbers which may appear on this tab may be NLA to the NHA which appears on the Report Order Detail, General tab. ALL NLA component controls will appear under the appropriate P/N S/N. P/N Description The description of the part. Select checkbox Check to make the time control effective to that part number. Once this checkbox is selected, the option to edit the reset date of that particular time control and/or removal actuals becomes available (if applicable). Note: Deselecting a control in the Receiving Inspection Detail, R/O Control tab will not affect that control's value in the Repair Order Detail, Control tab. Control This is the Part Number with the time control. Overdue indicator 'Overdue' appears in red for each Control that is overdue. It appears once the Save button is selected for a Receiving Inspection. A warning prompt also pops up indicating that at least one P/N Control or one P/N E/C has reached scheduled time and will become unserviceable. To see the prompt, refer to the Receiving Inspection Detail, General Tab. Schedule Hours/Cycles/Days The number of hours/cycles/days allotted for a specific time control schedule. The schedule figure is set up via the Settings/Update/P/N control button. Actual Hours/Cycles/Days The number of accumulated hours/cycles/days against the time control schedule. Reset Date The last reset date of the part time control. Removal Schedule The removal schedule field is used to track component removals (i.e. a wheel assembly), where a certain number of removals should occur before an overhaul needs to be performed. Removal Actual The number of times the component has been removed from an aircraft. The actuals figure is automatically adjusted with each A/C P/N transaction. Audit Select the Audit Calendar Control Select to activate calendar control on this part. Calendar selected items are “days by the calendar” regardless of whether they are installed on an aircraft or not. If calendar control is selected, the system will block the other time parameters for that entry by graying out the appropriate fields. Note: The switch _________________________________________________________________________
Enter/verify the following information for an Engineering Control: _________________________________________________________________________ Select checkbox Check to make the engineering control effective to that part number. Once this checkbox is selected, the option to edit the reset date of that particular time control and/or removal actuals becomes available (if applicable). Note: E/Cs with a Mandatory Classification cannot be deselected. The following error message 'Reset De-Selection' appears: Note: Deselecting a control in the Receiving Inspection Detail, R/O Control tab will not affect that control's value in the Repair Order Detail, Control tab. Control The Engineering Control that specifies aircraft or component scheduled maintenance intervals. Note: E/Cs with a Mandatory Classification are displayed in red and cannot be deselected. For more information refer to the Engineering Control, General Tab via the Engineering - E/C Training Manual. Schedule Hours/Cycles/Days The number of hours/cycles/days allotted for a specific engineering control schedule. The schedule figure is set up in the Schedule Tab via the Engineering/Update/Engineering Control. Actual Hours/Cycles/Days The number of accumulated hours/cycles/days against the engineering control schedule. Reset Date The last reset date of the engineering control. Removal Schedule The Removal Schedule field is used to track component removals (i.e. a wheel assembly), where a certain number of removals should occur before an overhaul needs to be performed. Removal Actual The number of times the component has been removed from an aircraft. The actuals figure is automatically adjusted with each A/C P/N transaction. _________________________________________________________________________ When an Engineering Control is updated before the part passes Receiving Inspection, the R/O Control tab will reflect any of the changes made to the E/C (including if the control becomes overdue). After clicking on the Save After the receiving inspection transaction is carried out, the item will be available for issue to an aircraft.
Link P/N Control to Shop E/C: The relationship between the P/N Control and Shop E/C are now linked. This is shown in the Receiving Inspection, R/O Control tab. The following P/N Control is linked to the below Shop E/C:
The part has been received: Go to the Receiving Inspection, R/O Control tab: When the Control checkbox for FNC is selected, the Control checkbox for 95278-A is selected. Similarly, if one checkbox is de-selected, the other becomes de-selected. When the Reset Date is populated for the FNC: . . . the Reset Date becomes populated for the 95278-A: The linked relationship between the P/N Control and Shop E/C can also be seen in Repair Order Detail, Control Tab, via Repair Order which can be found in the Orders Training manual. |
||||||
| Top of Page |
Download Online Help
Print
|
|||||