Publication Date: 8/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

GSE Setup

The general Ground Service Equipment (GSE) records must be created before utilizing the GSE Engineering, Planning, and Production features. Within this, the serviceable items and the specific parts to be used must all be created, along with a GSE Initial P/N Load, if necessary.

The following is the basic life cycle of the GSE process, particularly the setup of general records:

Ground Service Equipment Process Swim Lane 2

Once the GSE Setup and Configuration has been conducted, the user can utilize GSE Engineering.

In This Section

Select the Document Control and/or Image buttons

GSE P/N Master Buttons, via GSE Process

See Also

Ground Service Equipment Process Topics

GSE Configuration

GSE Engineering

GSE Utilization Recording and GSE Planning

GSE Production

Top of Page Publication Date: 8/17/2026 Share Print