GSE SetupThe general Ground Service Equipment (GSE) records must be created before utilizing the GSE Engineering, Planning, and Production features. Within this, the serviceable items and the specific parts to be used must all be created, along with a GSE Initial P/N Load, if necessary. The following is the basic life cycle of the GSE process, particularly the setup of general records:
Once the GSE Setup and Configuration has been conducted, the user can utilize GSE Engineering. |
|||||||