GSE EngineeringTo ensure that Planning and Production can be conducted for Ground Service Equipment, GSE Engineering Controls and Task Cards must be created to associate with the necessary work. The following is the basic life cycle of GSE E/Cs and T/Cs:
Once Ground Service Equipment Engineering Controls and scheduled Task Cards are created, the items can be utilized and the work can be planned and carried out. |
|||||||