Publication Date: 8/17/2026
Share
Print
|
||||||
|
The E/C Called On From the Engineering Manual Compliance window, select the E/C Called On The E/C Called On pop-up appears, indicating all of the Called On E/Cs:
De-selecting the checkbox allows the user to override the compliance for the Called On E/C. Compliance will only be taken on the Parent E/C. |
||||||
| Top of Page |
Publication Date: 8/17/2026
Share
Print
|
|||||