|
Process Flow Topics > Engineering Control Process Topics > Creating Engineering Controls > Is the E/C being created automatically or manually? > Is the E/C being created through TraxDoc or MPD? > Select the Save Button to Import
Select the Save Button to Import
Upon preparing to import the MPDs and inputting the proper information in the Manufacturer Data Import window, select the Save button to create the E/Cs. After the import is complete, it is necessary to review the created E/Cs to ensure that the correct information has been brought into the system. For P/N E/Cs, effectivity has to be added through the P/N CTL button in the Engineering Control window. Finally, for the E/C to be linked to an order and complied with, authorization must be completed.
|