Publication Date: 8/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

A/C Actual Flight Setup and Configuration

Before creating A/C Actual Flights and conducting A/C Actual Flights Closings, administrators must set up the security and revision configurations.

The following is the basic life cycle of an A/C Actual Flight, particularly the setup and configuration:

Aircraft Actual Flight (Manual Entry) Process Swim Lane 1

Note: Other Switches that affect A/C Actual Flights will be mentioned throughout this process. For more information on all switches, refer to the Technical Records Switches Manual.

 

Before conducting A/C Actual Flights Closings, administrators must set up the security and revision configurations.

  • Security - Technical Records / Update / A/C Actual Flights Closing
  • Switch - ACFLTCLS

Once all of these configurations have been set up, users can begin an A/C Actual Flight Creation.

In This Section

A/C Actual Flight Ready to be Created

A/C Actual Flights Ready to be Closed

See Also

Aircraft Actual Flight (Manual Entry) Topics

A/C Actual Flight Creation

A/C Actual Flights Closing

Top of Page Publication Date: 8/17/2026 Share Print