Publication Date: 11/17/2026
Share
Print
|
||||||
RPTSCHDMAND - Make the E/C Repeat Schedule MandatoryMake the E/C Repeat Schedule Mandatory Affected Window: w_engineering_eu
Switch Set to Yes: When set to Yes, the Repeat Schedule of the E/C will be mandatory and the system will prompt the user with a hard warning.
The following Engineering Control is being created. Notice the Repeat Schedule is mandatory.
Switch Set to No: When set to No, the user will receive a soft warning if the Repeat Schedule of the E/C is null; however, the E/C will save.
Notice that despite the soft warning regarding the empty Repeat Schedule field, the The Engineering Control is able to save successfully.
|
||||||
| Top of Page |
Publication Date: 11/17/2026
Share
Print
|
|||||