Download Online Help
Print
|
|||||||
|
The Document The associated document(s) appear in the AD Status report (Engineering/Print/Engineering Control Print) in the Document/Service Bulletin column. From the Engineering Control window, select an E/C. Select the Document On the system Query, Print, and Explorer, the user can select any one of these documents and get information about the main E/C it is associated with. Additional information can be viewed in the Engineering Document, Informational tab and/or entered through the Notes
The following options/information is available in this window: E/C The Engineering Control that specifies aircraft or component scheduled maintenance intervals. The selected E/C to which document association is to be made to. E/C Type The Engineering Control Type. E/C Document The document reference number associated to the E/C. Document Revision The documents most recent revision number. Category The category code of the document that is being referenced. This is set up via System Tran Code Explorer/Engineering/E/C Document Category. Document Date The date of the document being entered into the system. Description A short description of the document. Import This button allows the user the capability to import document data from a tab decimal text file in a specified format. _________________________________________________________________________
Note: This window allows the user to view documents (explained above) as well as E/Cs that have been linked using the E/C Link For example, the user can utilize the Document button to organize E/Cs and then run E/C Prints. The user is given an Airworthiness Directive (AD) that is the same or similar to that of a French Directive (CN). Instead of setting up one E/C for the AD and one E/C for the CN, the user can create the E/C Document Category of “CN” (Settings/ Explorer/System Transaction Code), set up the one E/C for the AD, and use the Document
E/C Document via Non-Routine Express: When a FUR is created via the Follow Up Requirement button of the W/O Non-Routine Express window, the Scheduled Task Card entered in the Non-Routine Express window automatically becomes the E/C Document for the FUR E/C. For example, notice that the following Non-Routine Task Card is associated to a Scheduled Task Card. A FUR E/C is then created for the N/R T/C by selecting the Follow Up Requirement button. The automatically created E/C is then viewed from the Engineering Control window. When the Engineering Document |
|||||||
| Top of Page |
Download Online Help
Print
|
||||||