Download Online Help Print

Previous Topic

Next Topic

Book Contents

Book Index

Compliance Button, via Engineering Control

There are two types of E/C compliances: A/C E/C compliance and P/N E/C compliance. Select the Compliance but_compliance_sm button to view a history of compliance records associated with an E/C. When the E/C is accomplished on a Work Order (Production or Shop) or Repair Order, a record of the E/C compliance for all tail numbers or part serial numbers will be kept in this window.

Note: The Engineering Compliance window has been updated and is now organized by A/C Compliance and A/C, P/N Compliance and P/N. This is useful for more efficient data gathering. This is a view only window and the information in this window cannot be edited or updated in this window.

The user also has the option to select the Select but_select_small button and view in Query Mode the details of the actual Work Order or Repair Order which the E/C was complied on. For additional information, refer to the Compliance Button, via Engineering Compliance of the Engineering Training Manual.

 

The following options/information is available in this window:
_________________________________________________________________________

Revision

The Revision of the E/C at the time of compliance.

Amendment

The Amendment of the E/C at the time of compliance.

Frequency Count

The E/Cs current frequency status. For example, there are 4 Total Frequencies to the E/C A-Check (A1, A2, A3 and A4). This P/N may be on the 3rd Frequency Count (A3) out of the 4 Phases. This field tells planning which frequency the record is currently on, and which Called On E/C dependencies to pull onto the Work order.

Note: Frequency Count and the Completed NO fields must match the Completed/ Frequency Flag for the proper E/C Called On functionality.

Order NO

The relevant Repair or Work Order Number the E/C was complied against.

Reset By

The user that accomplished the Work Order (Production or Shop) Closing or Repair Order Receiving.

Reset Date

The date that the E/C was complied with through the Work Order (Production or Shop) bgin Closed or the Repair Order being received.

Reset Hours/Minutes

The time at which this E/C was complied with through the Work Order (Production or Shop) being Closed or the Repair Order being received.

Location

The location in which the E/C was complied at.

Document

The Document information entered in Manual Compliance.

Remarks

Any general remarks about the compliance event.

Created By

The user who created the record.

Created Date

The date the record was created.

Modified By

The user who last modified the record.

Modified Date

The date the record was last modified.

_________________________________________________________________________

Other buttons offered in the Engineering Compliance, via Engineering Control include the following:

In This Section

Notes Button, via Engineering Compliance

Attachment Button, via Engineering Control

See Also

Engineering Control Buttons

Notes Button, via Engineering Control

Print Button, via Engineering Control

Document Button, via Engineering Control

A/C Button, via Engineering Control

P/N CTL Button, via Engineering Control

Task Card Control Button, via Engineering Control

Task Card Button, via Engineering Control

Revision Control, via Engineering Control

E/C Link Button, via Engineering Control

Attachment Button, via Engineering Control

E/C Rename/Copy Button, via Engineering Control

Change E/C Revision Button, via Engineering Control

Economic Analysis Button, via Engineering Control

MPD Button, via Engineering Control

Top of Page Download Online Help Print