The Task Card Control function allows the user to link Task Cards to an E/C. Just as E/Cs have their own setup configuration and requirements, Task Cards have their own configuration and requirements as well. When an E/C is added to the Work Order, the Task Cards attached to that E/C will be automatically brought into the Work Order also at the same time, based on the configuration of the Task Card. For example, if A/C Effectivity is switched 'On' for the Task Cards, only Task Cards with the same Effectivity as the aircraft listed on the Work Order will be copied. To configure the E/C and Task Card link, select the Task Card Control
Note: Switch The following options/information is available in this window: E/C The Engineering Control that specifies aircraft or component scheduled maintenance intervals. Engineering Control that the Task Card(s) will be linked to. Revision The revision can be alpha numeric. When the revision is changed and saved, the system will prompt the user with a revision control record, where the changes made for the specific revision can be saved for auditing purposes. The 'Revised By' field will be automatically updated with the user's user code, and the revision date can be set as required. Task Card The Task Card / Job Card that details the scheduled maintenance work. In the Task Card field, specify the Task Card that will be attached to the E/C. Link To Control that is going to be linked to original E/C. Item (0 = ALL) The user can specify the item on the Task Card to be added to the E/C, if necessary. This allows for the creation of a dynamic Task Card applied to a fleet or type/series with various job card instruction items applied to selected type/series or A/C tail numbers. If no item number is specified, the default value of “0” will appear and all items on the Task Card will be added. Identifier This is a unique identification number applied to item effectivity. When item effectivity is revised, deleted, re-sequenced, this identifier value acts as an audit. Sort Order Allows the user to specify which order the Task Card will print in a work package. These sequence numbers are sorted according to their numeric values. If there is more than one Task Card containing a Sort Order, all Sort Order numbers will be compared with one another, so that they print in the sequence. Group Groups allows the user to create a template that will be used to automatically create complex Work Orders based on parameters set up using the Group and Sub-Group fields. Subgroup Sub-Groups allow the user the option to further expand the relationships between Groups by creating Groups within Groups. Essentially, Work Orders within Work Orders. _________________________________________________________________________ In the case of a large maintenance event such as a C-Check Inspection, there may be a large number of cards that require entry. To add additional cards as required, continue by selecting the New Once the user has entered the appropriate E/C and Task Card link, select the Save Note: Task Cards cannot be re-Opened once the associated W/O Engineering Control has been reset. However, Non-Routine Task Cards can be re-opened if the W/O E/C has been reset. To associate the E/C to a Task Card "Pending Authorization," it must be done through Engineering Authorization Management or Task Card Authorization Management while either are pending authorization depending on the configuration of Switch Note: If the Task Card and the Engineering Control being linked together do not have the same Aircraft Effectivity, a soft warning appears when the window is saved. Select OK to continue with the save. |
||||||
| Top of Page |
Download Online Help
Print
|
|||||