Task Card Control Button, via Engineering Control Authorization

The Task Card Control function allows the user to link Task Cards to an E/C.

Just as E/Cs have their own setup configuration and requirements, Task Cards have their own configuration and requirements as well.

When an E/C is added to the Work Order, the Task Cards attached to that E/C will be automatically brought into the Work Order also at the same time, based on the configuration of the Task Card. For example, if A/C Effectivity is switched 'On' for the Task Cards, only Task Cards with the same Effectivity as the aircraft listed on the Work Order will be copied.

To configure the E/C and Task Card link, select the Task Card Control but_task_card_control_small button.

Note: Switch ECTCLINK controls how E/Cs and Task Cards are linked in the system. If this switch is set to No, the E/C-T/C link will work either way. The user can modify E/C-T/C links via revisions to E/Cs or T/Cs from either the Engineering Control window or Task Card control window. If this switch is set to Yes, modifications to E/C-T/C links will be modified by default from the Task Card control window. If this switch is set to Yes and the Config Other field contains EC, then engineering links will only be modified from the E/C-T/C control window.

The following options/information is available in this window:
_________________________________________________________________________

E/C

The Engineering Control that specifies aircraft or component scheduled maintenance intervals. Engineering Control that the Task Card(s) will be linked to.

Revision

The revision can be alpha numeric. When the revision is changed and saved, the system will prompt the user with a revision control record, where the changes made for the specific revision can be saved for auditing purposes. The 'Revised By' field will be automatically updated with the user's user code, and the revision date can be set as required.

Task Card

The Task Card / Job Card that details the scheduled maintenance work. In the Task Card field, specify the Task Card that will be attached to the E/C.

Link To

Control that is going to be linked to original E/C.

Item (0 = ALL)

The user can specify the item on the Task Card to be added to the E/C, if necessary. This allows for the creation of a dynamic Task Card applied to a fleet or type/series with various job card instruction items applied to selected type/series or A/C tail numbers. If no item number is specified, the default value of “0” will appear and all items on the Task Card will be added.

Identifier

This is a unique identification number applied to item effectivity. When item effectivity is revised, deleted, re-sequenced, this identifier value acts as an audit.

Sort Order

Allows the user to specify which order the Task Card will print in a work package. These sequence numbers are sorted according to their numeric values. If there is more than one Task Card containing a Sort Order, all Sort Order numbers will be compared with one another, so that they print in the sequence.

Group

Groups allows the user to create a template that will be used to automatically create complex Work Orders based on parameters set up using the Group and Sub-Group fields.

Subgroup

Sub-Groups allow the user the option to further expand the relationships between Groups by creating Groups within Groups. Essentially, Work Orders within Work Orders.

_________________________________________________________________________

In the case of a large maintenance event such as a C-Check Inspection, there may be a large number of cards that require entry. To add additional cards as required, continue by selecting the New but_new_small button. The user also has the option to utilize the Multi Task Card Select but_task_card_control_small button when adding multiple cards at once to an E/C. This speeds up the process and allows the user to select multiple cards and add them to the E/C and Task Card link window in one step.

Once the user has entered the appropriate E/C and Task Card link, select the Save but_save_small button.

Note: Task Cards cannot be re-Opened once the associated W/O Engineering Control has been reset. However, Non-Routine Task Cards can be re-opened if the W/O E/C has been reset.

To associate the E/C to a Task Card "Pending Authorization," it must be done through Engineering Authorization Management or Task Card Authorization Management while either are pending authorization depending on the configuration of Switch ECTCLINK.

Note: If the Task Card and the Engineering Control being linked together do not have the same Aircraft Effectivity, a soft warning appears when the window is saved.

Select OK to continue with the save.

See Also

Engineering Control Authorization Buttons

Notes Button, via Engineering Control Authorization

Compliance Button, via Engineering Control Authorization

Release For Authorization Button, via Engineering Control Authorization

Cancel Revision Button, via Engineering Control Authorization

Preview Conflict Work Order Button, via Engineering Control Authorization

A/C Button, via Engineering Control Authorization

P/N CTL Button, via Engineering Control Authorization

Attachment Button, via Engineering Control Authorization

E/C Rename/Copy Button, via Engineering Control Authorization

Economic Analysis Button, via Engineering Control Authorization

MPD Button, via Engineering Control Authorization