Publication Date: 8/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Link AD or SB E/C to Existing EO E/C

If the E/C is for an Airworthiness Directive or Service Bulletin, it is often necessary to link the Airworthiness Directive or Service Bulletin E/C to an Existing Engineering Order E/C. This is done through the Engineering Control, Schedule Control tab or the Engineering Control, Schedule Controlled By tab. For more information, refer to the Engineering Control, Schedule Control Tabs subprocess.

See Also

Is the E/C for an AD or SB?

Create an EO E/C

Top of Page Publication Date: 8/17/2026 Share Print