Publication Date: 8/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Is the E/C for an AD or SB?

YES: If the E/C is for an Airworthiness Directive or Service Bulletin, it is often necessary to Create an Engineering Order E/C or Link the Airworthiness Directive or Service Bulletin E/C to an Existing Engineering Order E/C.

NO: If the E/C is not for an Airworthiness Directive or Service Bulletin, then the E/C is Ready to be Linked to an Order.

 

This decision pertains to the Engineering Control Process.

In This Section

Create an EO E/C

Link AD or SB E/C to Existing EO E/C

See Also

Is the E/C being created automatically or manually?

Is the E/C being created through TraxDoc or MPD?

Refer to the Engineering Control, Schedule Tab

Refer to the Engineering Control, Schedule Control Tabs

Image Button

Is the E/C for A/C or P/N?

Authorize E/C

Ready for Engineering Control Compliance

Top of Page Publication Date: 8/17/2026 Share Print