Publication Date: 8/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Is the E/C for A/C or P/N?

A/C: If the E/C being created if for an A/C, then A/C Effectivity has to be added along with A/C Effectivity for P/Ns upon compliance of the E/C through the A/C CTL button and the E/C, P/N Effectivity Control tab.

P/N: If the E/C being created is for a P/N, then P/N Effectivity has to be added though the P/N CTL button.

 

This decision pertains to the Engineering Control Process.

See Also

Is the E/C being created automatically or manually?

Is the E/C being created through TraxDoc or MPD?

Refer to the Engineering Control, Schedule Tab

Refer to the Engineering Control, Schedule Control Tabs

Image Button

Authorize E/C

Is the E/C for an AD or SB?

Ready for Engineering Control Compliance

Top of Page Publication Date: 8/17/2026 Share Print