Planning Info Button, via A/C Planning Results

Select the Planning Info but_planning_info_small button to view the A/C Planning Transaction Window. From this pop-up window, the Planned Start Date is defaulted from the Due Date or the date as defined as the Planning Lead Days on the record's Engineering Control, Schedule tab. The user can override this Planned Date as required. For example, if a C-Check is coming due in April, 2017 and an A-Check is scheduled for May, 2017, the user may override the Planned Date to May 2017 to have both the A-Check and C-Check completed. This way, the aircraft is not down twice in two months.

Planning_Info_1

Notice that the Planned Start Date is defaulted from the Due Date or the date as defined as the Planning Lead Days on the Engineering Control, Schedule Tab of the Planning Element Item. The user can override this Planned Date as required. For example, if a C-Check is coming due in April, 2009 and an A-Check is scheduled for May, 2009, the user may override the Planned Date to May, 2009 to have both the A-Check and C-Check completed. This way, the aircraft is not down twice in two months.

Planning_Info_2

 

The following information/options are available in this window:
_____________________________________________________________________________________

A/C

The individual aircraft tail number.

Control

A schedule that lets a mechanic know when a part needs to be removed for repair, inspection, etc.

P/N

The Part Number reference for the aircraft part.

P/N S/N

The Serial Number for the specific serialized part.

Defect

The defect number (or log book number).

Planned Start Date

This is used with the Work Order Planning Element. Enter the W/O Planned Start Date.

The Planned Start Date must be populated before the user can save any changes in the A/C Planning Transaction window. If the field is null (00/00/0000) the user will receive the following error:

Planning_Info_3

Planned End Date

This is used with the Work Order Planning Element. Enter the W/O Planned End Date.

Note: The Planned End Date must be populated before the user can save any changes in the A/C Planning Transaction window. If the field is null (00/00/0000) the user will receive the following error:

Planning_Info_4

Planned Start Hrs/Min

This is used with the Work Order Planning Element. Enter the W/O Planned Start Hrs/Min.

Planned End Hrs/Min

This is used with the Work Order Planning Element. Enter the W/O Planned End Hrs/Min.

Planned Location

The location in which the Work Order is going to take place.

Group

Select the shift group from the drop down menu to work on the planned item.

_____________________________________________________________________________________

Note: The Reset To Due Date but_reset_to_due_date_small button is also available in this window for additional functionality.

Verify that all of the information in the above window is correct.

Select the Save but_save_small button.

Select the Notes but_notes_small button to add or review any related notes. Select the Save but_save_small button. The Save prompt will appear. Select OK.

Planning_Info_5

The Note is added to the Planning Event. Select the Save but_save_small button and Exit the Window.

Planning_Info_6

The Note has been added, as seen on the Planning Notification button.

Note: The color of the Planning Date field will change based on the Planning Transaction Condition Codes via the Planning Transaction code manual.

Planning_Info_7

The Planned Date, and any associated notes that are created with the Notes but_notes_small button, will be cleared once the Work Order associated with the planned item is 'Closed' or manually complied with.

Select the Planning Notification button to view notes related to Planning.

Planning_Info_8

In This Section

Reset To Due Date Button, via A/C Planning Transaction

See Also

A/C Planning (Inventory Planner View) Results

Man Hours, via A/C Planning Results

Schedule, Actual, and Remaining Hours/Cycles/Days, via A/C Planning Results

LRU Checkbox, via A/C Planning Results

Repair Flag, via A/C Planning Results

Transaction Notification Button, via A/C Planning Results

Work Order Flag, via A/C Planning Results

A/C Totals, via A/C Planning Results

Due At, via A/C Planning Results

Authorization Flag, via A/C Planning Results

E/C Called On Button, via A/C Planning Results

Internal Checkbox, via the A/C Planning Details

Mandatory Flag, via A/C Planning Results

Select Checkbox, via A/C Planning Results

Tool Status Indicator Button, via A/C Planning Results

Part Status Indicator Button, via A/C Planning Results

Reservation Status Indicator Button, via A/C Planning Results

Requisition Button, via A/C Planning Results

Calendar Hours Icon, via A/C Planning Results

Top of Page Publication Date: 8/17/2026 Share Print