Publication Date: 11/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Compliance Tab, via E/C Detail

logo_V8 big button

The Compliance tab displays an Engineering Control's last 10 compliance records in a query view.

From the Due List window, select the E/C's hyperlink to open the E/C Detail.

plan-compliance

From the E/C Detail, select the Compliance tab to view the E/C's compliance history.

plan-compliance2

  

The following information/options are available in this window:
_____________________________________________________________________________________

E/C

The Engineering Control that specifies aircraft or component scheduled maintenance intervals.

Order Type

The type of order the E/C was complied with (e.g., Work Order, Repair Order, etc).

Order NO

The relevant Repair or Work Order Number the E/C was complied against.

Reset Date

The date the E/C was complied with.

Order By

The user that accomplished the Work Order Closing (Production or Shop), receiving of the Repair Order, completion of Receiving Inspection, or Manual Compliance.

Total Actual Hours

The total number of flight hours at the time of compliance.

Total Actual Cycles

The total number of flight cycles at the time of compliance.

Remark

This field is used to enter any additional information regarding the compliance event. This is a free text field.

_____________________________________________________________________________________

See Also

E/C Detail, via Interactive Planner

General Tab, via E/C Detail

Schedule Tab, via E/C Detail

Schedule Control Tab, via E/C Detail

E/C Content Tab, via E/C Detail

Top of Page Publication Date: 11/17/2026 Share Print