Download Online Help
Print
|
|||||||||||
|
Manual Compliance can be conducted for a specific P/N Engineering Control through selecting the desired record from the Engineering Control P/N window, accessed through the P/N CTL Note: This window is a query only window, and cannot be edited or updated. To update/edit any information in the Engineering Control P/N window, the user must do so via the P/N CTL From the Engineering Control Compliance window, select the P/N CTL The system displays the Engineering Control P/N window. For information regarding the fields and functions in the Engineering Control P/N window, refer to the P/N CTL Note: With the proper security, the Status of the Engineering Manual Compliance for the individual records will be cascaded and reflected from the Status of the E/C.
Upon selecting the Compliance
Within the Engineering Manual Compliance Detail for the P/N E/C, the Compliance information can be populated at the top. The following options/information is available in this window: Reset Date The date that the E/C was complied with through the Work Order (Production or Shop) bgin Closed or the Repair Order being received. Hrs/Min The time at which this E/C was complied with through the Work Order (Production or Shop) being Closed or the Repair Order being received. Status The current status of the E/C Compliance (i.e. Open, Cancel, Terminate, etc.). Remarks Any general remarks about the compliance event. R/O or W/O If the E/C was complied with on a Repair Order or a Work Order. Order No. The relevant Repair or Work Order Number the E/C was complied against. Document The document reference number associated to the E/C. Hours/Cycles/Days Reset E/C hours/cycles/days at time of reset. _________________________________________________________________________ General information regarding the P/N E/C can be viewed and/or edited, as needed, through the following tabs and buttons:
To conduct the Manual Compliance for a specific P/N S/N, select into a record by clicking into it. Doing so will bring the user to the Engineering Effectivity Override for P/N S/N Engineering Control Manual Compliance. If the user enters a Reset Date prior to the current effective date of the E/C for the or P/N S/N, the system will only write a historical record and update the completed NO., however the Effective Date will not change. If the user enters a date after the current effective date, the system will write a history record and change the effective date of the item. If the user changes the status to Terminated, Cancel or N/A, the system will make the repeat number equal to the completed number. This will terminate the E/C and it will no longer appear in the Planning query option. The compliance record for the E/C is written upon saving the record. The user can edit/amend/delete previously created compliance records if required. |
|||||||||||
| Top of Page |
Download Online Help
Print
|
||||||||||