12 - Engineering Module

Engineering Control

Added to E/C drop-down selection window: When right-clicking in the E/C field to select an E/C, the E/C's Description is displayed in its entirety in the drop down selection window. This will help the user by providing more information on the E/C before making a selection.

Engineering Control, Schedule Tab

Activating Schedule checkbox: Select this checkbox to enable the Activating Schedule for the E/C's First Schedule to begin. Utilizing this option makes the (Activating) Total Hours/Cycles/Days fields available, along with the Earliest checkbox, to specify when the First Schedule starts for the effective component(s). This Schedule can be overridden through the Override Standard Schedule (E/C) Button, via The Engineering Control, Schedule Tab or the Override functionality of the P/N CTL Button, via Engineering Control.

Activating Total Hours/Cycles/Days: The Hours/Cycles/Days that must be accumulated by an A/C or P/N before the First Schedule of the P/N can begin.

Activating Earliest checkbox: The Earliest checkbox option is selected if the E/C Schedule parameters are to be planned at the earliest occurrence. For the latest occurrence, this option should not be selected. By selecting the Earliest checkbox, the schedule will be determined by which occurrence comes first; Hours/Cycles/Days or Date.

TaskControl, Optional 1 Tab

Use T/C as Template for N/R checkbox: Allows the Task Card information, like Description, ATA, Items, etc., to be applied as a template for Non-Routine Task Cards created through the TaskControl application.

logo_TaskControl small Note: This checkbox is informational only in the system, but is functional in Trax's TaskControl Application. When creating Non-Routine Task Cards in the application, users can apply the template of any Task Cards with this checkbox selected in the system. For more information, contact the appropriate administrator.

TaskControl, Quick Resolution Tab

Fault Found checkbox: Allows the Task Card to be flagged as having a fault found during the work after it has been completed through the TaskControl application.

logo_TaskControl small Note: This checkbox is informational only in the system, but is functional in Trax's TaskControl Application. Faults being found during the work can only be flagged as such through the application for Task Cards that have this checkbox selected in the system. For more information, contact the appropriate administrator.

MPD Loader, Preparing the MPD File

FSTOTAL: Added to MPD Loader Import. Total Hours and Total Days. The system will convert months into days for the Total Days field.

See Also

12 - Engineering

12 - Engineering Switches

12 - Engineering Security