Publication Date: 8/17/2026 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Engineering Control Supervisor

The Engineering Control Supervisor serves similar purposes as the Engineering Control. The only main difference is that changes can be done on existing E/Cs without having to create a new revision. Therefore, it is recommended to keep the security for this program at a low level and only grant few users access.

Note: Switch ECVIAREV. If this switch is set to No, then changes can be done on an E/C without having to do a new revision in Engineering Control. It is recommended for increased security to set this switch to Yes, thus forcing users to make a new revision when doing changes, and giving access to the Engineering Control Supervisor to selected people only.

12_EngineeringControlSupervisor(1)

The tab-sheets and functions of this program are identical to the ones in Engineering Control. For additional information, refer to Engineering Control section via the Engineering - E/C Training Manual.

See Also

Engineering E/C, Update Menu

Engineering Authorization Management

Engineering Control Compliance

Engineering Control

Engineering Control Selection

Engineering Control Shop

Engineering Fatigue

Manufacturer Data Import

Manufacturer Electronic Data Load (MEDL)

Top of Page Publication Date: 8/17/2026 Share Print