Publication Date: 11/17/2026
Share
Print
|
||||||
FLSCHDAYS - Run Using Flight Schedule Days Config Number
Run Using Flight Schedule Days Config Number Affected Window: w_ac_planning_qry
Note: Switch
Switch Set to Yes If set to Yes, the run on flight schedule due date in Planning Control will be based on the A/C Flight schedule and this switch's Config Number field.
The following value has been entered in the Config Number field.
The following A/C has a set Mean Hour and Mean Cycle value.
The A/C does not have a current flight schedule.
An effective E/C is added ot the A/C with the following schedule.
Three five-hour flights have been scheduled for the A/C.
In the Planning Control Due List window, the Run on Flight Schedule checkbox is selected and the Run button is selected.
The due date of the planning record is 4/28/2023. This is 3 (the Config Number value) days after the initial date (4/21/203) plus the Mean Hours/Cycles per day (7 days).
Switch Set to No If set to No, the run on flight schedule will only be based on the A/C Flight Schedule.
|
||||||
| Top of Page |
Publication Date: 11/17/2026
Share
Print
|
|||||