|
PLANNING CONTROL > Planning Control Release Handbooks > Planning Control Version 7 Release Handbooks > Planning Control 7.5
Planning Control 7.5
|
|
Planning Control
|
|
Details Tab, via W/O
|
7.5
|
Contract drop down - Use this drop down to select an applicable W/O Contract from a pre-rendered list. W/Os with an associated Contract will be deemed as a Third Party Work Order.
|
|
Due List
|
7.5
|
Multiple Occurrences for the Next checkbox - The following functionality has been added:
Time Span Number - Enter the number of years, months, weeks, or days for which the occurrence calculation will apply.
Time Span drop-down - Select this drop-down to specify the time span in years, months, weeks, or days that will be used to forecast multiple occurrences. Use the field to the left of the drop-down to enter the number of years, months, weeks, or days for the forecast. Note that the Multiple Occurrences for the Next checkbox must be selected.
|
|
Interactive Planner
|
7.5
|
Sites drop down - Select to filter the Interactive Planner view by the selected Site(s).
|
7.5
|
NHA P/N, via Due List
|
|
The part’s Next Higher Assembly P/N (if applicable).
|
7.5
|
NLA Position, via Due List
|
|
The position of the Next Lower Assembly. This position indicates where the N/L/A is to be installed in the assembly.
|
Switches
|
7.5
|
INTPLANRR - When the switch INTPLANRR is set to Yes, the Refresh Rate for the Planning Control Interactive Planner is determined by the Config Number of the switch (in minutes). Note that the minimum Refresh Rate configuration is 5 minutes. For more information, refer to INTPLANRR in the Planning Training Manual.
|
Topic updated: 12/3/2025 12:28:22 PM
|