Planning Control 7.5.1

Planning Control

 

Due List, via Planning Control

7.5.1

ATA (Chapter / Section / Paragraph) - The following functionality was added to this field: Users can select multiple chapters, sections, and/or paragraphs.

7.5.1

Defect - Select a Defect number ID to filter the query.

7.5.1

W/O - Select a W/O to filter the query.

7.5.1

Multiple Browser Searches Supported - Planning Control is enhanced to support multiple browser tabs, allowing users to open and work with multiple Planning Control sessions simultaneously. Each browser tab maintains its own independent state, enabling planners to run, compare, and analyze multiple planning queries side by side without losing context or reloading filters. This significantly improves efficiency when reviewing and comparing Due List and Interactive Planning windows.

7.5.1

Sort By - The following option was added to the Sort By drop down: Installed Position.

7.5.1

Concession Registry, via Planning Control

 

The Concession Registry window allows users create new Concessions (by selecting the New Concession button) or to to find existing Concessions (by selecting the Run button).

 

Interactive Planner

7.5.1

The following functionality was added:

Planning Control is enhanced to support multiple browser tabs, allowing users to open and work with multiple Planning Control sessions simultaneously. Each browser tab maintains its own independent state, enabling planners to run, compare, and analyze multiple planning queries side by side without losing context or reloading filters. This significantly improves efficiency when reviewing and comparing Due List and Interactive Planning windows.

7.5.1

New Concession Button, via Planning Control

 

Users can add a concession to an upcoming maintenance event (E/C, P/N E/C, P/N Control, or Defect Report) by selecting the New Concession Planning Control-Concession button.

 

Planning Results, via Due List

7.5.1

Remaining Hours/Cycles/Days - The following functionality was added:

Note: If an A/C or P/N has an initial or recurring schedule with a set date, the Days column will display that set date. For more information refer to Schedule, Actual, Remaining Hours/Cycles/Days, via Due List.

7.5.1

Revision - The revision number of the E/C. This can be alpha numeric. When the revision is changed and saved, the system will prompt the user with a revision control record, where the changes made for the specific revision can be saved for auditing purposes. The 'Revised By' field will be automatically updated with the user's user code, and the revision date can be set as required. For more information refer to Revision, via Due List.

7.5.1

Schedule Hours/Cycles/Days - The following functionality was added:

Note: The column header shows Initial schedule when the A/C or P/N S/N is on its initial schedule.

Note: The column header shows Repeat Schedule when the element is on its repeat schedule.

Note: The OVR icon appears when an E/C or P/N Control schedule is overridden.

For more information refer to Schedule, Actual, Remaining Hours/Cycles/Days, via Due List.

7.5.1

Whichever Occurs - The Whichever Occurs field is located under the Mix Schedule field and reflects filter selected in the Order by drop-down field. For more information refer to Whichever Occurs, via Due List.