Planning Results, via Due List

The Due List Planning Results are displayed at the bottom of the window. The Due List results can be displayed in one of three views: Due List, Graphical, and Table. See below for an example of each view.

The results include various types of information depending on the types of records being displayed:

 

Due List View

The Due List view is the default view for planning query results in the Due List window.

plan-views

 

Graphical View

The Graphic view offers a plot view for Engineering Controls.

plan-views2

 

Table View logo_V7_small

The Table view presents planning element information from the Due List in a condensed, tabular format. All fields and buttons are organized into columns. To view additional fields, use the horizontal scroll bar at the bottom of the table. This layout enables users to quickly sort through their forecast as needed.

plan-views3

 

The following information/options are available in this window:
_____________________________________________________________________________________

Table Setting but_Table Setting_planning control button

Users can select the Table Setting button to pick which columns are shown in the table.

logo_V7_small Note: The columns selected or deselected can be saved for future use.

Export as Excel button

This button provides users with an Excel (.xls) copy of the planning element information displayed in the table.

A/C

The individual aircraft tail number.

Task

The maintenance event that is due and must be scheduled on a W/O. These include Defects, E/Cs, P/N E/Cs, and P/N Controls. The task's description is listed when applicable.

emrov8 Note: This is two columns, Task Type and Task, the latter of which lists the event number.

Description

Description of the Task Card.

P/N

The Part Number reference for the aircraft part.

S/N

The Serial Number for the specific serialized part.

Schedule

The Schedule Hours/Cycles/Days for the item.

emrov8 Note: This is three columns, Schd Hrs, Schd Cycs, and Schd Days.

Actual

The Actual time accumulated on the item (hours/cycles/days) from the effective date and/or the last compliance date.

emrov8 Note: This is three columns, Act Hrs, Act Cycs, and Act Days.

Remaining

Planning will calculate the W/O Remaining Hours/Cycles and Days based on the time between the Planning Date and the W/O Schedule Start Date.

emrov8 Note: This is three columns, Rem Hrs, Rem Cycs, and Rem Days.

Due at A/C

The schedule of Hours/Cycles/Days intervals where the maintenance item is due.

emrov8 Note: This is two columns, Due At AC Hrs and Due At AC Cycs.

Due Date

The calculated due date of the item (rounded to the nearest date). Planning calculates the due date based on the number of remaining hours and/or cycles factored by the mean hours set-up for each aircraft.

Plan Date

If an Open Order or Requisition is linked to the line item, then the Plan Date is the Order's Delivery Date or the Requisition's Required Date. If there is no open Order or Requisition, then the Plan Date is the current date.

W/O

The Work Order used to categorize, manage, and schedule work requirements for aircraft maintenance.

W/O Location emrov8

The location of the work order.

W/O Site emrov8

The site of the work order.

W/O Start Date emrov8

The start date of the work order.

W/O Start Hr emrov8

The start hour of the work order.

W/O Start Min emrov8

The start minute of the work order.

W/O End Date emrov8

The end date of the work order.

W/O End Hr emrov8

The end hour of the work order.

W/O End Min emrov8

The end minute of the work order.

Defect Type emrov8

The type of defect, for example CABIN or PILOT.

MDDR emrov8

The maintenance deferred defect record number.

Defer emrov8

The deferral action chosen for the defect, e.g., PLAN or TRIAGE.

Defer Category emrov8

The deferral category, e.g., MEL or FDE.

EOM emrov8

Whether end-of-month is set.

Mandatory

The Mandatory Flag will be displayed for E/Cs that have a Mandatory Classification.

Task Card

The Task Card / Job Card that details the scheduled maintenance work.

ATA

The Air Transport Association Chapter, Section and Paragraph numbers associated to the Due List.

Internal checkbox

The Internal checkbox is used to determine if work can be done internally. The Internal Capability checkbox will be set to 'On' by default only for those items that a company has the capability to perform internally. The checkbox can be set up through Defect Reports/General Tab, E/C/Other Tab, and P/N Master/P/N Control button.

Capability Area

The Capability Area identifies where a maintenance task can be accomplished in association with the customer's internal capabilities (e.g., a particular E/C can only be accomplished during a heavy maintenance visit at a heavy maintenance capable Site). The Capability Area can be assigned for E/Cs, P/N Controls, and Defect Reports. However, a maintenance task with any Capability Area can be scheduled on Work Orders at Sites that have their Capability Area set to 'ALL'.

Frequency

Indicates how many frequencies (occurrences) the E/C is to be performed for one frequency cycle to be completed.

Repeat

The parameter for the subsequent repetitive occurrences of the Engineering Control.

Concession Applied

An Applied Concession is the reason that allows an aircraft's schedule to be overridden

Concession Allowed

An Allowed Concession allows the schedule to be overridden for a specific circumstance.

Etops

The ETOPS designation indicates the associated maintenance procedure affects the aircraft’s ETOPS airworthiness and reliability qualification status.

Called On

The E/C with a called-on relationship to the selected E/C.

Called By emrov8

The E/C with a called-by relationship to the selected E/C.

MEL Category

Select to filter defects by the selected MEL Category.

Sub Category

A Sub Category can be used to further define the E/C Category, if applicable. For example, users may want to classify their ADs for Engines, APUs, and Landing Gear separately. The Sub Category System Transaction Code is set up via Settings/ Explorer/ System Transaction Code/ Engineering.

emrov8 Note: This is spelled "Subcategory" in version 8.

Installed Position

The position on the aircraft of the installed part

NHA P/N

The part’s Next Higher Assembly P/N (if applicable).

NLA Position

The position of the Next Lower Assembly.

Man Hours

The number of Man Hours needed to complete the applicable tasks. The Hours displayed will include all MECH, INSP, and DUPLICATE INSP hours associated with the tasks.

Category

The category of the E/C (e.g., AD, SB, CHECK).

Current Rev

The Task Card's most recent authorized revision number.

Pending Rev

The Pending E/C Revision but_pending rev_planning control icon appears if an Engineering Control has a revision pending authorization. The E/C's revision number is displayed below the icon.

Sampling Schedule

The Sampling Schedule Indicator appears when an E/C schedule is driven by an Override Sampling Schedule. This is configured from the Override Sampling Schedule button in the Engineering Control Schedule tab.

No Schedule

Select this checkbox to filter for E/Cs that do not have a Schedule.

Plan Flag

The Work Order flag indicates that the current planning element is associated to a Work Order.

Part Status

The Part Status Indicator Part Availibity Green_Planning Control button displays parts available in inventory, on order, or reserved for a particular location (partial/all/none).

Tool Status

Select the Tool Status Indicator button to display tools available in inventory, on order, or reserved.

Requisition Status

The current status of the Requisition (E.g., Open, Ordered, Closed, Canceled).

_____________________________________________________________________________________

In This Section

A/C Totals, via Due List

Advance Filter Button, via Due List

Authorization Flag (Open Revision E/C), via Due List

Capability Area, via Due List

Category, via Due List

Due At, via Due List

Defect Fields, via Due List

E/C, via Due List

E/C Called On Button, via Due List

E/C Type, via Due List

ETOPS Designation, via Due List

Internal checkbox, via Due List

Hazardous Part Indicator, via Due List

Last Compliance, via Due List

Last Occurrence, via Due List

Limit Schedule Icon, via Due List

Mandatory Flag, Due List

Load Level Date, via Due List

Man Hours, via Due List

Mix Schedule Button, via Due List

NHA and NLA Fields, via Due List

Parent E/C Button, via Due List

Part Status Indicator Button, via Due List

Pending E/C Revision Icon, via Due List

Planning Info Button, via Due List

Plan Notes Button, via Due List

Position, via Due List

Reservation Status Indicator, via Due List

Revision, via Due List

Sampling Schedule Indicator, via Due List

Schedule, Actual, Remaining Hours/Cycles/Days, via Due List

Sub Category, via Due List

Tool Status Indicator Button, via Due List

Transaction Notes Button, via Due List

Whichever Occurs, via Due List

W/O Flag, via Due List

See Also

Due List, via Planning Control

Due List Buttons, via Planning Control

Warning Messages (Planning Control)