PLANNING CONTROL > Due List, via Planning Control > Planning Results, via Due List > Load Level Date, via Due List
Load Level Date, via Due List

The Load Level checkbox available in the Engineering Control, Schedule tab allows users to spread out the work dates of an E/C on multiple aircraft easily through an automated process.
Select this checkbox to facilitate load-leveling with planned accomplishment based on volume and resource constraints. For example, E/Cs effective to 100 aircraft all due in 100 days will be assumed to be scheduled at a rate of 1 aircraft per day.

For example, two aircraft are scheduled with the same E/C named J-WEEKLY and the same due date of 06/08/2026. By checking the Load Level checkbox, different Load Level dates of 06/08/2026 and 06/03/2026 will appear in the Due List for those two aircraft.

|
See Also Planning Results, via Due List A/C Totals, via Due List Advance Filter Button, via Due List Authorization Flag (Open Revision E/C), via Due List Capability Area, via Due List Category, via Due List Due At, via Due List Defect Fields, via Due List E/C, via Due List E/C Called On Button, via Due List E/C Type, via Due List ETOPS Designation, via Due List Internal checkbox, via Due List Hazardous Part Indicator, via Due List Last Compliance, via Due List Last Occurrence, via Due List Limit Schedule Icon, via Due List Mandatory Flag, Due List Man Hours, via Due List Mix Schedule Button, via Due List NHA and NLA Fields, via Due List Parent E/C Button, via Due List Part Status Indicator Button, via Due List Pending E/C Revision Icon, via Due List Planning Info Button, via Due List Plan Notes Button, via Due List Position, via Due List Reservation Status Indicator, via Due List Revision, via Due List Sampling Schedule Indicator, via Due List Schedule, Actual, Remaining Hours/Cycles/Days, via Due List Sub Category, via Due List Tool Status Indicator Button, via Due List Transaction Notes Button, via Due List Whichever Occurs, via Due List W/O Flag, via Due List |
|