|
PLANNING CONTROL > Due List, via Planning Control > Planning Results, via Due List > Last Occurrence, via Due List
Last Occurrence, via Due List

The Last Occurrence indicator appears on the final occurrence of a planning element when multiple occurrences are calculated. To display multiple occurrences, the Calculate Multiple Occurences for the Next checkbox must be selected in the Planning Actions section of the Due List.
The Occurrence number is displayed at the bottom of each planning element occurrence. The number of occurrences listed is controlled by the Occurrence Count field in the Planning Actions section of the Due List.

|
See Also Planning Results, via Due List A/C Totals, via Due List Advance Filter Button, via Due List Authorization Flag (Open Revision E/C), via Due List Capability Area, via Due List Category, via Due List Due At, via Due List Defect Fields, via Due List E/C, via Due List E/C Called On Button, via Due List E/C Type, via Due List ETOPS Designation, via Due List Internal checkbox, via Due List Hazardous Part Indicator, via Due List Last Compliance, via Due List Limit Schedule Icon, via Due List Mandatory Flag, Due List Load Level Date, via Due List Man Hours, via Due List Mix Schedule Button, via Due List NHA and NLA Fields, via Due List Parent E/C Button, via Due List Part Status Indicator Button, via Due List Pending E/C Revision Icon, via Due List Planning Info Button, via Due List Plan Notes Button, via Due List Position, via Due List Reservation Status Indicator, via Due List Revision, via Due List Sampling Schedule Indicator, via Due List Schedule, Actual, Remaining Hours/Cycles/Days, via Due List Sub Category, via Due List Tool Status Indicator Button, via Due List Transaction Notes Button, via Due List Whichever Occurs, via Due List W/O Flag, via Due List |
|