The Called On Repeat option is to be used with the Called On First option. Note: The Child/ Dependent E/Cs interval should always match the interval of the Parent E/Cs schedule. For example, if the Parent E/C is scheduled by 500 hours or 185 days, then the Child/ Dependent E/Cs schedule should match. Additionally, we recommend that the Plan E/C checkbox, via the Engineering Control, Schedule tab remains selected for the Child/ Dependent E/C to allow for Planning to observe the E/C. A Called On First E/C must be specified prior to choosing this option or an error message will appear.
The Called On Repeat option must be selected to have the original E/C initiate on another Parent E/C after the Called On First E/C compliance. The original E/C will then be performed in accordance with the Called On Repeat parameters.
The following options/information is available in this window: Freq (Frequency) If the original E/C is to be performed on an interval basis, use the Frequency Field. For example, if the Frequency is set to 02, then every 2nd time that the Parent E/C is attached to a Work Order, the Called On, or Child E/C, is also automatically brought onto the Work Order as well. Start At The number specified in the Start At field will instruct the system to initiate the original E/C on the Control E/C's occurrence. Please note that this is not a Frequency number. _________________________________________________________________________
In this example, the original E/C will start at the 3rd occurrence (Start At field) of the Called On Repeat E/C (after the completion of the Called On Repeat E/Cs 2nd frequency, which has 7 total frequencies). Since the Start At number represents an occurrence, not a Frequency number, the Start At number can be greater than the Total Frequency number of the Called On Repeat E/C. The Frequency field must be used if the original E/C is to be performed on an interval basis. When the Called On Repeat E/C is attached to the Work Order, the original E/C is also attached to the Work Order, providing that the Original E/C has been complied with in accordance with the Called On First parameters at least once. |
||||||
| Top of Page |
Download Online Help
Print
|
|||||